Skip to main content
"Mixing the first batch of concrete for Crib #1 on the heavy duty bridge at the site of Norris Dam, just below the Dam itself.", 11/01/1933
"Mixing the first batch of concrete for Crib #1 on the heavy duty bridge at the site of Norris Dam, just below the Dam itself.", 11/01/1933
"Mixing the first batch of concrete for Crib #1 on the heavy duty bridge at the site of Norris Dam, just below the Dam itself.", 11/01/1933

"Mixing the first batch of concrete for Crib #1 on the heavy duty bridge at the site of Norris Dam, just below the Dam itself.", 11/01/1933

Artist (American, 1874 - 1940)
Date1933-1935
MediumGelatin silver print
DimensionsImage (sight): 7 3/8 x 9 7/16 inches (18.7 x 24 cm); Frame: 14 1/4 x 18 1/4 inches
Classifications99-Photography (other than reproductive, 98)
Credit LineGift of Mr. Charles E. Hoffman
Object number1977.22.21
On View
Not on view
Collections
Below Leeds Dam, Northampton, Massachusetts
Stephen Petegorsky
1989, printed 1998